This OEM designs and manufacturers stage II vapor recovery systems and components. Their systems are designed to collect gasoline vapors as vehicles are being refueled, and should reduce harmful vapor emissions by at least 95%.

The Challenge

  • Replace current 3-phase components with a 2-phase motor and control
  • Insure motor would drop into OEM’s existing system
  • Keep the former endbells to insure correct fit and new motor integration
  • Be able to retrofit their installed base during routine system refurbishments

The Solution

  • Custom-designed 2-phase AC motor
  • Size and mounting configuration needed to fit customer’s existing system design without special tooling or setup costs
  • Reduced operating costs for system users by switching from 3-phase to a 2-phase motor

(Pictured: AC Stator and Rotor with Customized Housing)

 